CASE STUDY
Oil Intake Pipeline Inspected After 21 Years of Denso™ Protection
Buried Coatings
Project Data
Location | Japan |
Products | Densyl KF™ Tape, Denso Profiling Mastic™ |
Date | August 2009 |
Project Details
An oil intake pipeline in Japan, which was originally protected in 1985 with a Denso system combining Densyl KF™ Tape and Denso Profiling Mastic™, was inspected in March 2006 to see how it was performing.
The original Denso coating system was removed from part of the pipeline to check its condition. The pipe, flange, nuts and bolts were all found be in excellent condition.
After the inspection was finished the removed section of tape and mastic was replaced.
All of the engineers involved had to agree that the inspection provided a very impressive demonstration of the long-term corrosion prevention capabilities of the Densyl KF Tape system.